top of page

Surrey Hills Extension

Alterations and additions to an existing 2-storey brick veneer home to become a 5-bedroom, 3-bathroom split-level home.

 

Construction Cost $300K. Completed in 2009.

Full Services. 

 

 

With the client wishing to make significant additions whilst softening the prominence of the new extension and a 1980s 2nd storey addition, all new work was camouflaged by extending the roof lines and pitch of the existing terracotta tiled roof and re-interpreting the existing disjointed material palette. 
 

Extensive hard-landscaping re-connected the inside and outside on a sloping site to cater for seasonal entertainment, leisure and a kitchen garden. The builder was selected and the contract sum negotiated. The construction period was 7 months and staged to allow the owner to remain in occupation.

bottom of page